Project 6: New substation at De Lier The demand for connection capacity is growing steadily in this area on account of the installation of CHPs. In 2008 the decision was taken to build a new 150 kV substation at De Lier. Specifications were drawn up and a design was produced. The project was also put out to tender on a European level. While the engineering work was going on, all the permits were applied for and the land was purchased and prepared for the build. TenneT is also laying a cable connecting the substation to the high-voltage grid.
|